PHO705: Week 19 Reflection

A model is created for the Exhibition space to experiment with layouts. Here is the first building block to start to work with.

Starting to create the exhibition space in a 3D model (Sketchup Pro)

This is a straightforward adaption of the Summer exhibition which had three of these layouts in a C-shaped floor plan. The adaption is from triptychs to a straight run of 6 mounts of 40cmx50cm mount boards.

Each mount stands on parade or is a metaphor for such.

Ultimately, two other rows will be present making a total of three rows and should run parallel so when the viewer is looking at the front row they would see all of the other rows behind as soldiers on parade. The viewer could process as if conducting a parade inspection.

Okay, so the above 3D model as the start and is an enabler. It has already allowed some ideas to try out as to how to best place the work as befits the intent.

More to follow.

On reflection, the exercise to date has demanded practice be gained in using the 3D IMB layout tool SketchUp Pro. This time is an investment for now and for the future.

Ancillary items to add to the space include the facsimile of the exhibition in a box i.e. the portable exhibition, which stands alongside the main exhibition while it is running. Another item to include is the handbound book.

Within the space there will also be two video screens, an audience seating area and a secondary exhibition of outtakes.

Studio equipment on stands has to be added for the somewhat vital daylight balanced lighting.

Print Handling

The philosophy the author is running with is of not being precious about the prints and in fact encouraging audience interaction. I’ve been normalised to the presence of print handling and during the summer exhibition, I encouraged viewers to interact with a couple of exercises being set out. It created a degree of immersion and sat alongside the other media and sound, creating a suitable atmosphere. Overall this makes a kind of performance.